Install DELTA®-PT vertically. Use plugs to fix DELTA®-PT-PROFIL strips to the upper and lower sheet edges. Fixing plugs should be spaced approx. 25 cm apart both horizontally and vertically. Start in the centre of each sheet and work towards the sides.
Sheets should overlap by approx. 20 cm along the mesh-free edge. There should be no bridges between the plaster and the damp cellar wall. Reinforce and seal butt joints in corners.
Plaster should be trowel applied in two coats. Do not apply the second coat before the first has initially set.
Do not use DELTA®-PT-PROFIL with plasterboard panels. To enable the moisture-laden air to circulate, leave a gap 1 cm wide below the ceiling and above the floor.
Special, high-density PE and HDPE gauze.
| Roll size | 2,0 x 20,0 m |
|---|---|
| Pressure resistance | approx. 70kN/m² |
| Air volume for the rear ventilation | approx. 5.5 l/m² |
| Weight | approx. 530g/m² |
| Stud height | approx. 8mm |
| Membrane overlap | approx. 20cm |
| Material usage | Per m² of wall: DELTA-PT approx. 1.15m² DELTA-PT PROFILE SECTION approx. 1m DELTA-PT NAIL PLUGS approx. 15. |